News
niles Test 7-2-2014
2
:
A user has created a story in Draft status. She is inquiring about the possibility of being able to assign this particular story to 3 different categories
all at once
, without having to manually assign it to each individual category.
Please
list
the exact steps/workflow would you advise the user to utilize.
Now, create a test story in the
WNOW
Producer.
Then create 3 test categories.
Using the same workflow/steps that you described, please
Using the same workflow/steps that you described, please
apply
these same steps to your test story.
NOTE:
- Your story should be assigned to each category with a different position –
Top Story; Full Horizontal; and Breaking News
.
- The story should
not
be
manually
assigned to each category.
-
In addition
– the story should be set to go to
Draft status
after
24 hours
; and should
Archive
itself after
2 weeks
.
Please reply back with the
Live URL
for your test story only. (No need to send the test categories).